Efficiency of Time Comparing With Modular Rigs for Work-Over Operation

Stalin Mark Fernandes, Sanjay Joshi, Mohammed Reza Mobaraki

Abstract: In the past - 300ft Leg Jack-Up Rig predominantly used to Drill and Complete wells. In depleted phase currently, MH field is witnessing dominantly well work-over / repair scope to sustain production. Seabed inconsistencies caused by pug marks left by previous Jack-Up rigs and sea-bed pipe line network hinder Jack-Ups to approach platform and rework wells. Specificity of Jack-Up Rigs to approach Specific Platforms due to signature pug-marks left behind Increase in market demand for large Jack-Up rigs, increased day rates to very high levels. Above technical and economic compulsions drove decision making and acceptability to consider modular rigs over other alternatives.

In order to ensure optimum performance of your rig, reduce downtime and maintain safety of your personnel, planned maintenance and accurate inspections are essential. Drilling’s Rig Inspection Workshop (RIW) teaches the inspection and maintenance procedures required to ensure equipment integrity on land rigs, platform rigs and jack-up rigs. Candidates learn to implement the relevant standards and understand industry requirements so that they can verify the condition of a rig’s equipment and improve safety, thus reducing the number of accidents and protecting the asset.

Keywords: Comparing with Modular Rigs for Work-Over Operation.

Title: Efficiency of Time Comparing With Modular Rigs for Work-Over Operation

Author: Stalin Mark Fernandes, Sanjay Joshi, Mohammed Reza Mobaraki

International Journal of Engineering Research and Reviews

ISSN 2348-697X (Online)

Research Publish Journals

Vol. 3, Issue 2, April 2015 - June 2015

Citation
Share : Facebook Twitter Linked In

Citation
Efficiency of Time Comparing With Modular Rigs for Work-Over Operation by Stalin Mark Fernandes, Sanjay Joshi, Mohammed Reza Mobaraki