MASTER GAS SYSTEM PHASE 2 PRE-COMMISSIONING JOURNEY

Mahmoud A. Younis

Abstract: The Master Gas System (MGS) Phase 2 Pipeline project has entered its final construction stage of Mechanical Pre-commissioning of the 56” pipeline. The project pre-commissioning of the pipeline has commenced at all 3 major packages (Eastern, Central, and Western) areas. Pipeline pre-commissioning activities consist of several activities from mechanical cleaning, gauging, hydrotesting, dewatering, and chemical cleaning. Mechanical cleaning of debris, hydrotesting to check strength, dewatering of used chemically treated water, and chemical cleaning and preservation are critical activities that must be performed effectively before the pipeline is put in service. Utilization of different types of scrapers like foam, bi-directional, brush, intelligent, etc. are some critical tools to help in the pre-commissioning stage. After completion of all these activities, the pipeline will be re-instated with all required valves and will be preserved with nitrogen to make it ready for operation use

Keywords: Pre-Commissioning, Mechanical Cleaning, Scrapers, Debris, Nitrogen, Strength, Tightness, Chemical cleaning,

Title: MASTER GAS SYSTEM PHASE 2 PRE-COMMISSIONING JOURNEY

Author: Mahmoud A. Younis

International Journal of Engineering Research and Reviews

ISSN 2348-697X (Online)

Vol. 10, Issue 3, July 2022 - September 2022

Page No: 33-37

Research Publish Journals

Website: www.researchpublish.com

Published Date: 12-September-2022

DOI: https://doi.org/10.5281/zenodo.7072363

Vol. 10, Issue 3, July 2022 - September 2022

Citation
Share : Facebook Twitter Linked In

Citation
MASTER GAS SYSTEM PHASE 2 PRE-COMMISSIONING JOURNEY by Mahmoud A. Younis